Activities

/
Activities

Prefabricated Houses

Construction Process

  1. Measurements and license issuing
  2. Create designs and 3D designs
  3. Start of excavation and foundation works
  4. Installation of anti-corrosion cable and metal plate
  5. Installation of metal frame and construction of metal roof
  6. Placement of electrical and plumbing installations
  7. All surfaces are plastered and painted
  8. Laying tiles on floors
  9. Placement of internal and external frames
  10. Installation of cupboards in the kitchen, in the rooms and installation of internal frames

Basic Version

  1. Metallic frame
  2. External masonry and Internal masonry
  3. Roof
  4. Plumbing installations (water supply and sewerage pipes)
  5. Electrical installations (only the pipes are installed)
  6. Coatings

Completed Version

  1. Metallic frame
  2. External masonry and Internal masonry
  3. Roof
  4. Coating
  5. Full plumbing installation
  6. Full electrical installation
  7. Floor and wall tiles
  8. Internal frames
  9. Exterior frames (with knobs and locks)
  10. Interior and exterior coloring
  11. Kitchen
  12. Room wardrobes
  13. Sanitary ware

Technical Residential Specifications

Frame

The structure of the building frame consists of metal poles and iron beams according to the regulations for the construction of metal buildings (Eurocode 3).

Roof

Metal truss roof made of industrialized iron, special membrane and tiles that meet all the requirements of European specifications.

Coatings

1st stage and 2nd stage of lime-free plastering

3rd stage coating

4th sanding with black sand

Painting system

1st stage it will be pretreated with acrylic, waterproof primer

2nd stage: painting of external walls with special high quality acrylic paint

3rd stage painting of interior walls with high quality plastic paints

Wardrobes and interior frames

Kitchen and room wardrobes are included by design.

The interior doors will be made of laminate in various colors of your choice

Walls

The walls are made of iron, structural mesh and internally of 10 cm thick 80 APS expanded polystyrene insulation

Complete electrical and plumbing installation

Flooring and wall covering

All areas will be paved with tiles of various sizes and a variety of colors of the employer’s choice.

Frames

Installation of PVC frames in white with double glazing, roller blinds and window net.

Conventional Houses

Construction Process

  1. Measurements and license issuing
  2. Create designs and 3D designs
  3. Start of excavation and foundation works
  4. Installation of anti-corrosion cable and metal plate
  5. Installation of metal frame and construction of metal roof
  6. Placement of electrical and plumbing installations
  7. All surfaces are plastered and painted
  8. Laying tiles on floors
  9. Placement of internal and external frames
  10. Installation of wardrobe in the kitchen, in the rooms and installation of internal frames

Basic Version

  1. Metallic frame
  2. External masonry and Internal masonry
  3. Roof
  4. Plumbing installations (water supply and sewerage pipes)
  5. Electrical installations (only the pipes are installed)
  6. Coatings

Completed Version

  1. Metallic frame
  2. External masonry and Internal masonry
  3. Roof
  4. Coating
  5. Full plumbing Installation
  6. Full electrical installation
  7. Floor and wall tiles
  8. Internal frames
  9. Exterior frames (with knobs and locks)
  10. Interior and exterior coloring
  11. Kitchen
  12. Room wardrobes
  13. Sanitary ware

Technical Residential Specifications

Frame

The structure of the building frame consists of metal poles and iron beams according to the regulations for the construction of metal buildings (Eurocode 3).

Roof

Metal truss roof made of industrialized iron, special membrane and tiles that meet all the requirements of European specifications.

Coatings

1st stage and 2nd stage of lime-free plastering

3rd stage coating

4th sanding with black sand

Painting system

1st stage It will be pretreated with acrylic, waterproof primer

2nd stage: painting of external walls with special high quality acrylic paint

3rd stage painting of interior walls with high quality plastic paints

Wardrobes and interior frames

Kitchen and room wardrobes are included by design.

Interior doors will be made of laminate in various colors of your choice

Walls

The walls are made of iron, structural mesh and internally of 10 cm thick 80 APS expanded polystyrene insulation

Complete electrical and plumbing installation

Flooring and wall covering

All areas will be paved with tiles of various sizes and a variety of colours of the employer’s choice.

Frames

Installation of PVC frames in white with double glazing, roller blinds and window nets.

Building Renovations

We undertake any kind of renovation, reconstruction and provide all the necessary services for a guaranteed result.

Energy upgrade of a house

We undertake all work subsidized by the home savings program to upgrade the energy efficiency of your building.

The works include:

  1. Frame replacement
  2. Thermal Insulation
  3. Heat pump installation
  4. Installation of a solar heating system
  5. Installation of air conditioners
  6. Installation of shading systems